Pais / Región
Paises

Provincias / Departamentos
Colombia Colombia
Argentina Argentina
Canada Canada
Chile Chile
Ecuador Ecuador
España España
Guatemala Guatemala
Honduras Honduras
Mexico Mexico
Panama Panama
Paraguay Paraguay
United States United States
Uruguay Uruguay
Categorias / Industrias
Publication: 0000-00-00 00:00:00
United States SAM

Replacement of Fabric Roof and End Walls for Aluminum Framed Structure

Process Number W91ZLK-22-Q-0001

USA

Dates:


Notice ID:

W91ZLK-22-Q-0001

Department/Ind. Agency:

DEPT OF DEFENSE

Sub-tier:

DEPT OF DEFENSE

Sub Command:

W6QK ACC-APG DIR

Office:

W6QK ACC-APG DIR

General Information:


All Dates/Times are:

(utc-05:00) eastern standard time, new york, usa

Updated Published Date:

nov 29, 2021 01:12 pm est

Original Published Date:

0000-00-00 00:00:00

Original Response Date:

dec 30, 2021 10:00 am est

Inactive Policy:

15 days after date offers due

Updated Inactive Date:

dec 17, 2021

Original Inactive Date:

jan 14, 2022

Initiative:
  • None***--***

Classification:


Original Set Aside:

total small business set-aside (far 19.5)

Product Service Code:

j083 - maint/repair/rebuild of equipment- textiles, leather, furs, apparel/shoe findings, tents/flags

NAICS Code:

332311 - prefabricated metal building and component manufacturing

Description:


Original Set Aside:

29 NOV 2021: CORRECTIONS Firm Fixed Price (FFP) proposals MUST be signed, dated, and received by 10:00 a.m. EST, 02 December 2021 Questions and responses have been posted. The contractor shall design, fabricate, and install new 22 oz. fabric panels for the roof and end walls of CCDC-CBC’s existing fabric walled aluminum framed structure. The structure is ~135’ long and has 10 ribs (9 bays). The roof section shall be made of one large membrane panel. The end wall has one penetration for the exhaust fan and is approximately 60 ft. wide and 30 ft. tall. The replacement fabric shall be the same material weight, type, and color as the rest of the structure. The replacement fabric shall include pockets at just above ground level to be used for applying down tension. The roof replacement shall be completed without the need to remove items stored inside.

Attachments / Links:


Document Size Updated date Download

Contact Information:


KO DIRECTORATE OF CONTRACTIN 6565 SURVEILLANCE LOOP

ABER PROV GRD , MD 21005-3013

USA

Primary Point of Contacts:

Peggy Y Pennie