

Weapons Research Experimentation Control Center (WRECC) Facility, Eglin AFB, Florida
Process Number W9127822R0002

Dates:
W9127822R0002
Department/Ind. Agency:DEPT OF DEFENSE
Sub-tier:DEPT OF DEFENSE
Sub Command:US ARMY ENGINEER DISTRICT MOBILE
Office:US ARMY ENGINEER DISTRICT MOBILE
General Information:
(utc-05:00) central standard time, chicago, usa
Updated Published Date:jul 01, 2022 12:03 pm cdt
Original Published Date:2022-04-21 14:28:00
Original Response Date:may 23, 2022 02:00 pm cdt
Inactive Policy:manual
Updated Inactive Date:apr 21, 2023
Original Inactive Date:apr 21, 2023
Initiative:- None***--***
Classification:
total small business set-aside (far 19.5)
Product Service Code:y1jz - construction of miscellaneous buildings
Description:
*AMENDMENT W9127822R0002-0007 is available at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9127822R0002* AMENDMENT W9127822R0002-0006 https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9127822R0002 AMENDMENT W9127822R0002-0005 is available at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9127822R0002 AMENDMENT W9127822R0002-0004 is available at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9127822R0002 AMENDMENT W9127822R0002-0003 is available at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9127822R0002 AMENDMENT 02 is available at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9127822R0002 AMENDMENT W9127822R0002-0001 is available at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9127822R0002. The description of work includes the construction of a 6,600 SF single story Weapons Research Experimentation Control Center (WRECC) at Eglin AFB, FL. The WRECC is a multipurpose facility containing an advanced Command and Control (C2) room, office workspace, conference room, data workstation and a secured vault and contains administrative workstations, control rooms, collaboration space, and necessary support functions for Range C-64 A/B/C and all Air Force Research Laboratory Munitions Division (AFRL/RW) arenas at Range C-64 A/B/C, C-64, and C-2. Work under this contract will include clearing, grubbing, and fill, controlled access road, gravel parking, side-walks, other site improvements to go with the multipurpose facility constructed with concrete foundation, thickened floor slabs; steel frame structural system; concrete masonry unit and metal stud walls with brick and stucco veneer; sloped metal roof; electrical; communications; fire detection and suppression; plumbing; compressed air systems and Heating Ventilating and Air Conditioning as required.Note: In accordance with Section 00 11 00, paragraph 3.1 of the solicitation, submission of electronic proposal packages shall only be via the Procurement Integrated Enterprise Environment (PIEE) website (https://piee.eb.mil/xhtml/unauth/home/login.xhtml OR- https://wawf.eb.mil -OR- https://piee.eb.mil). See attachments PIEE Solicitation Module Vendor Access Instructions and SOP PIEE Proposal Manager Offeror for instructions on getting access to the PIEE Solicitation Module and submitting your proposal. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9127822R0002' to obtain more details.*
Attachments / Links:
Document | Size | Updated date | Download |
---|
Contact Information:
KO CONTRACTING DIVISION 109 ST JOSEPH ST
MOBILE , AL 36628-0001
USA
Primary Point of Contacts:Ariel Chamberlain
Secondary Point of Contact:Kenneth.p.harlan