Pais / Región
Paises

Provincias / Departamentos
Colombia Colombia
Argentina Argentina
Canada Canada
Chile Chile
Ecuador Ecuador
España España
Guatemala Guatemala
Honduras Honduras
Mexico Mexico
Panama Panama
Paraguay Paraguay
United States United States
Uruguay Uruguay
Categorias / Industrias
Publication: 0000-00-00 00:00:00
United States SAM

Production Line Upgrades

Process Number W52P1J-22-Q-WP22

USA

Dates:


Notice ID:

W52P1J-22-Q-WP22

Department/Ind. Agency:

DEPT OF DEFENSE

Sub-tier:

DEPT OF DEFENSE

Sub Command:

W4MM USA JOINT MUNITIONS CMD

Office:

W4MM USA JOINT MUNITIONS CMD

General Information:


All Dates/Times are:

(utc-06:00) central standard time, chicago, usa

Updated Published Date:

(utc-06:00) central standard time, chicago, usa

Original Published Date:

0000-00-00 00:00:00

Original Response Date:

dec 06, 2021 03:00 pm cst

Inactive Policy:

15 days after response date

Original Inactive Date:

dec 21, 2021

Initiative:
  • None***--***

Classification:


Original Set Aside:

total small business set-aside (far 19.5)

Product Service Code:

4520 - space and water heating equipment

NAICS Code:

237110 - water and sewer line and related structures construction

Description:


Original Set Aside:

Army Contracting Command – Rock Island (ACC-RI) in support of Pine Bluff Arsenal (PBA) is seeking interested vendors who can purchase/install a new hot water supply system, waste water storage tanks for a waste water system, and a possible Option purchase/install of replacement robots for the 2 ABB Model IRB 6600 M2004 robots on PBA’s production line 5. This procurement includes the demolition of old equipment and the supply, installation, testing, and training of the new equipment and systems. The work to be performed consists of facility preparation, moving, installing, and restoring to operation the Government Furnished Equipment (GFE) and furnishing all other materials, equipment, supplies, labor and transportation to complete and make the production process fully operational within the facility. Work required shall be performed accordance with the specifications and drawings that will be provided at the time of solicitation issuance. Final acceptance will be based on the systems performance after installation at PBA and shall be evaluated against the acceptance criteria referenced within the solicitation. Operator and maintenance training shall be provided by the contractor for this system after acceptance. NAICS 237110 - Water and Sewer Line and Related Structures Construction Interested vendors shall send responses to the questions below to Ms. Carly Frye at carly.c.frye.civ@army.mil: Company Name with POC Name and Contact Information (Name, Phone Number, and Email Address) Company CAGE Code and DUNS Number Does your company have past performance history for a project with a similar scope? Has your company done work with the Federal Government in the past? Is your company registered in Joint Certification Program (JCP)? Is your company a small business? Will your company require progress payments? Does your company perform installation? Place of Performance: US Army, Pine Bluff Arsenal Pine Bluff, AR 71602 This is for MARKET RESEARCH ONLY. Participation in this effort is strictly voluntary with no cost or obligation to be incurred by the Government. The information you provide will only be utilized by ACC-RI in developing its acquisition approach for future requirements. Any information provided should be in be sent via email and submitted by 3:00 P.M. Central Time, 6 December 2021 to: carly.c.frye.civ@army.mil. Request questions must be provided in writing to the above point of contact.

Attachments / Links:


Document Size Updated date Download

Contact Information:


ARMY CONTRACTING COMMAND ROCKISLAND BLDG 350 RODMAN AVE

ROCK ISLAND , IL 61299-5000

USA

Primary Point of Contacts:

Carly Frye