Pais / Región
Paises

Provincias / Departamentos
Colombia Colombia
Argentina Argentina
Canada Canada
Chile Chile
Ecuador Ecuador
España España
Guatemala Guatemala
Honduras Honduras
Mexico Mexico
Panama Panama
Paraguay Paraguay
United States United States
Uruguay Uruguay
Categorias / Industrias
Publication: 2021-10-07 17:26:00
United States SAM

NM FLAP SJU 10(1) Cottonwood Campground Bridge

Process Number 6982AF21B000023

USA

Dates:


Notice ID:

6982AF21B000023

Department/Ind. Agency:

TRANSPORTATION, DEPARTMENT OF

Sub-tier:

TRANSPORTATION, DEPARTMENT OF

Sub Command:

6982AF CENTRAL FEDERAL LANDS DIVISI

Office:

6982AF CENTRAL FEDERAL LANDS DIVISI

General Information:


All Dates/Times are:

(UTC-07:00) MOUNTAIN STANDARD TIME, DENVER, USA

Updated Published Date:

Nov 09, 2021 02:59 pm MST

Original Published Date:

2021-10-07 17:26:00

Original Response Date:

Nov 09, 2021 02:00 pm MST

Inactive Policy:

Manual

Updated Inactive Date:

Dec 20, 2021

Original Inactive Date:

Dec 20, 2021

Initiative:
  • None***--***

Classification:


Original Set Aside:

Total Small Business Set-Aside (FAR 19.5)

Product Service Code:

Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS

NAICS Code:

237310 - Highway, Street, and Bridge Construction

Description:


Original Set Aside:

PROJECT DETAILS: NM FLAP SJU 10(1) Cottonwood Campground Bridge THIS PROJECT IS ADVERTISED AS A TOTAL SMALL BUSINESS SET-ASIDE. THIS IS A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE AVAILABLE. PROJECT DESCRIPTION: The project is to provide an accessible and maintainable roadway to the campground, a bridge will be constructed to span the width of the arroyo to the north of the existing roadway at the arroyo crossing, and will be elevated high enough to allow for the park service to continue to use maintenance equipment to keep the arroyo clear of excessive sediment accumulation. The new bridge will be constructed offline such that access to the campground will be maintained without interruption to traffic flow. The alignment of the roadway will be reconstructed upon completion of the bridge with profile adjustments as necessary to meet the deck elevation of the new bridge. SIGNIFICANT QUANTITIES: 3,950 cubic yard of embankment construction 2,120 cubic yard of placed riprap, class 3 1,220 cubic yard of placed riprap, class 4 194 cubic yard of structural concrete class A 430 liner feet precast prestressed concrete girder 186 liner feet of drilled shaft 36-inch diameter MISCELLANEOUS: The proposed work for this project includes installation of a new bridge which will free span the arroyo crossing. The new bridge is proposed to include two 12 foot lanes by 105 feet long with 4-foot-wide shoulders and metal railings for a total out to out width of 35 feet. All of the work is occurring in cultural and natural resource sensitive areas and there are numerous environmental constraints that will affect the construction schedule and type of operations. COST RANGE: The proposed project is estimated at a cost between $1,500,000 and $3,500,000. CONSTRUCTION DURATION: Construction is anticipated from FALL 2021 to April 2022. ADDITIONAL INFORMATION: Anticipated Award: Late November 2021

Attachments / Links:


Document Size Updated date Download

Contact Information:


12300 W. DAKOTA AVE

LAKEWOOD , CO 80228

USA

Primary Point of Contacts:

Jackie Schmuhl

Secondary Point of Contact:

Sheri Walsh