Pais / Región
Paises

Provincias / Departamentos
Colombia Colombia
Argentina Argentina
Canada Canada
Chile Chile
Ecuador Ecuador
España España
Guatemala Guatemala
Honduras Honduras
Mexico Mexico
Panama Panama
Paraguay Paraguay
United States United States
Uruguay Uruguay
Categorias / Industrias
Publication: 0000-00-00 00:00:00
United States SAM

AST STI SP0001 External Inspection Scott AFB, Illinois

Process Number W9128F22Q0007

USA

Dates:


Notice ID:

W9128F22Q0007

Department/Ind. Agency:

DEPT OF DEFENSE

Sub-tier:

DEPT OF DEFENSE

Sub Command:

W071 ENDIST OMAHA

Office:

W071 ENDIST OMAHA

General Information:


All Dates/Times are:

(utc-06:00) central standard time, chicago, usa

Updated Published Date:

(utc-06:00) central standard time, chicago, usa

Original Published Date:

0000-00-00 00:00:00

Original Response Date:

nov 24, 2021 02:00 pm cst

Inactive Policy:

15 days after date offers due

Original Inactive Date:

dec 09, 2021

Initiative:
  • None***--***

Classification:


Original Set Aside:

total small business set-aside (far 19.5)

Product Service Code:

h391 - inspection- fuels, lubricants, oils, and waxes

NAICS Code:

541990 - all other professional, scientific, and technical services

Description:


Original Set Aside:

5.1. Basic Services. 5.1.1. Perform an External AST inspection to also include the visual inspection of the containment area. The contractor shall visually inspect containment for ability to contain the entire contents of the tank in the event of catastrophic failure, assessing for cracks, settlement, and deterioration. Record dimensions of cracks and provide photographic evidence of each deficiency. 5.1.2. Provide DRAFT and FINAL inspection reports per the attached templates. The report(s) must include a record of NDE findings with drawings depicting plate layout and thickness measurement locations. Incorporate engineering analysis, suitability for service analysis pursuant to paragraph SUITABILITY FOR SERVICE, corrosion rate determinations, and remaining service life calculations. Provide separate report for each tank inspected. Specify the due date for the next inspection. 5.2. SUTABILITY FOR SERVICE: Evaluate inspection data to determine suitability for continued use. Identify conditions which pose a risk to integrity. Determine a metal loss threshold for mandatory repairs. In the determination of mandatory repairs: a. Use a "first, do no harm" approach to classifying tank repairs. b. Use Desired Service Interval as the time to next inspection unless notified otherwise by the Contracting Officer. c. Use minimum remaining thickness (MRT) no less than 100 mils at the next inspection. d. Do not classify as mandatory repair of conditions which are noncompliant with current standards but are un-related to structural or hydraulic integrity (e.g., gouge, improper weld spacing, weld profile). e. Apply repair determination to individual indications. Do not average across an entire plate or course.

Attachments / Links:


Document Size Updated date Download

Contact Information:


KO CONTRACTING OFFICE 1616 CAPITOL AVENUE

OMAHA , NE 68102-4901

USA

Primary Point of Contacts:

Nicole Parker