Pais / Región
Paises

Provincias / Departamentos
Colombia Colombia
Argentina Argentina
Canada Canada
Chile Chile
Ecuador Ecuador
España España
Guatemala Guatemala
Honduras Honduras
Mexico Mexico
Panama Panama
Paraguay Paraguay
United States United States
Uruguay Uruguay
Categorias / Industrias
Publication: 0000-00-00 00:00:00
United States SAM

F110 Fuel Nozzle Modification & Overhaul

Process Number FA812221R0010

USA

Dates:


Notice ID:

FA812221R0010

Department/Ind. Agency:

DEPT OF DEFENSE

Sub-tier:

DEPT OF DEFENSE

Sub Command:

FA8122 AFSC PZAAB

Office:

FA8122 AFSC PZAAB

General Information:


All Dates/Times are:

(utc-06:00) central standard time, chicago, usa

Updated Published Date:

(utc-06:00) central standard time, chicago, usa

Original Published Date:

0000-00-00 00:00:00

Original Response Date:

dec 01, 2021 03:00 pm cst

Inactive Policy:

15 days after date offers due

Original Inactive Date:

dec 16, 2021

Initiative:
  • None***--***

Classification:


Product Service Code:

j028 - maint/repair/rebuild of equipment- engines, turbines, and components

NAICS Code:

336412 - aircraft engine and engine parts manufacturing

Description:


Original Set Aside:

This requirement is for the Modifcation and Overhaul of the F110 Fuel Nozzles for Multiple FMS IEMP Partners Nations. The Government plans to award a Firm Fixed Price (FFP) Requirements type repair services contract, consisting of a 1-year basic ordering period, four 1-year ordering period options, and a 6-month extension for a total contract ordering period of 5-years, 6 months (66 months). The proposed contract is anticipated to be a SOLE SOURCE AWARD, in accordance with (IAW) FAR 6.302-4(a)(4) - International Agreement. 10 U.S.C.2304(c)(4) Award will be made only if the offeror meets the qualification requirements at the time of award IAW FAR clause 52.209-1. (See Attachment 7, "RQR). As stated in para 2. above, the Contract award is anticipated to be a sole-source award to the qualified contractor, Parker Hannifin Corporation (CAGE: 59211) Offeror shall complete the Pricing Matrix (Attachment 1). Offeror must ensure all required proposed pricing is provided, ensuring all ordering periods are priced. These consist of a 1-year basic ordering period, four 1-year ordering period options, and 6-month extension for the overhaul and modification effort (CLINs 0001-5001, 0002-5002). Any omission of required pricing may result in an unfavorable proposal evaluation. 6-month extension shall be priced with the same unit prices established and agreed upon for Option Period 4. An incomplete Pricing Matrix (Attachment 1) will be considered unreasonable. Ordering and Requirements Clauses with missing information will be completed upon award. In Accordance With (IAW) FAR 16.503(c) GOVERNMENT PROPERTY FURNISHED FOR REPAIR - When a requirements contract is used to acquire work on existing items of Government property, the Contracting Officer shall specify in the schedule that failure of the Government to furnish such items in the amounts or quantities described in the Schedule as "estimated" or "maximum" will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract. No Government Furnished Material (GFM) shall be provided. The Contractor shall furnish and deliver to the Government the services and supplies necessary to perform the following IAW the Terms and Conditions contained in this contract. Upon receipt of an order, the Contractor shall furnish all plant, labor, equipment and technical expertise to perform repair services desribed herein. In addition, the Contractor shall furnish those materials and parts contemplated in any attachments as may be further defined herein. All such items as may be set forth on order issued by the Government hereunder shall be repaired, modified, tested and prepared for storage and shipped to the Government as a completely serviceable item. Delivery is to be determined and will be specified with each individual order. Some of the units listed below, upon disassembly and/or inspection, can be determined to be beyond repairable limits specified in the work specifications and/or technical orders. Any cost for work performed by the Contractor, prior to determination that such equipment is beyond repairable limits shall be included in the price of the listed item. Condemnations shall be replaced and will not be counted as production. Accelerated delivery is desirable and acceptable.

Attachments / Links:


Document Size Updated date Download

Contact Information:


CP 405 739 4437 3001 STAFF DR STE 1AG1 98C

TINKER AFB , OK 73145-3303

USA

Primary Point of Contacts:

Ryan McCabe - Contracting Officer