Pais / Región
Paises

Provincias / Departamentos
Colombia Colombia
Argentina Argentina
Canada Canada
Chile Chile
Ecuador Ecuador
España España
Guatemala Guatemala
Honduras Honduras
Mexico Mexico
Panama Panama
Paraguay Paraguay
United States United States
Uruguay Uruguay
Categorias / Industrias
Publication: 2021-10-19 14:24:00
United States SAM

Turner Brewer Septic and WPS

Process Number 75H70122Q00003

USA

Dates:


Notice ID:

75H70122Q00003

Department/Ind. Agency:

HEALTH AND HUMAN SERVICES, DEPARTMENT OF

Sub-tier:

HEALTH AND HUMAN SERVICES, DEPARTMENT OF

Sub Command:

DIV OF ENGINEERING SVCS - SEATTLE

Office:

DIV OF ENGINEERING SVCS - SEATTLE

General Information:


All Dates/Times are:

(UTC-06:00) CENTRAL STANDARD TIME, CHICAGO, USA

Updated Published Date:

(UTC-06:00) CENTRAL STANDARD TIME, CHICAGO, USA

Original Published Date:

2021-10-19 14:24:00

Original Response Date:

Nov 18, 2021 02:00 pm CST

Inactive Policy:

15 days after date offers due

Original Inactive Date:

Dec 03, 2021

Initiative:
  • None***--***

Classification:


Original Set Aside:

Total Small Business Set-Aside (FAR 19.5)

Product Service Code:

Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES

NAICS Code:

237110 - Water and Sewer Line and Related Structures Construction

Description:


Original Set Aside:

Work is to be completed to a private home, under the jurisdiction of Pierce County. The contractor must review site conditions, and report any concerns or discrepancies to the Contracting Officer’s Representative (COR) in writing prior to beginning construction. The design is detailed in the County Approved Design, Attachment 1. In accordance with the Design, the contractor must: D.1. Work Requirements: The septic system and water pressure system installation shall include: D.1.1. Mobilization and demobilization. D.1.2. Installation of approximately 15 linear feet of 4” SCH 35 PVC solid sewer pipe. D.1.3. Installation of two underground double-sweep cleanouts. D.1.4. Installation of approximately 440 ft of sewer force main (2" PVC, SCH 40). D.1.5. Installation of a 1,500-gallon 2-compartment concrete septic tank with effluent filter, for main house. D.1.6. Installation of a 1,900-gallon concrete pump tank and controls (Liberty FL70 Series ¾ HP submersible effluent pump or equal, for main house. D.1.7. Installation of a 1250-gallon 2-compartment septic tank with pump and controls (Orenco PF5005 1/2 HP submersible effluent pump or equal), for ADU. D.1.8. Installation of a valve box and 1.5” PVC SCH 40 manifold. D.1.9. Installation of approximately 240 linear feet of sand-lined trench drainfield with 1” PVC SCH 40 lateral pipes. D.1.10. Installation of a 1 HP submersible well pump (Goulds 10GS10 or equal) and controls D.1.11. Installation of approximately 90 linear feet of 1.25” SCH 120 PVC drop pipe and submersible cable. D.1.12. Installation of a pitless adapter and well cap. D.1.13. Installation of two 81-gallon water pressure tanks (Amtrol WX255 or equal) and shared pressure switch. D.1.14. Installation of approximately 180 linear feet of 1.25” SCH 40 PVC water service line to ADU. D.1.15. Installation of approximately 280 linear feet of 1.5” SCH 40 PVC water service line to main Home.

Attachments / Links:


Document Size Updated date Download

Contact Information:


2201 6TH AVENUE MAIL STOP RX-24

SEATTLE , WA 98121

USA

Primary Point of Contacts:

Robert S. Miller

Secondary Point of Contact:

Andrew E. Hart