Pais / Región
Paises

Provincias / Departamentos
Colombia Colombia
Argentina Argentina
Canada Canada
Chile Chile
Ecuador Ecuador
España España
Guatemala Guatemala
Honduras Honduras
Mexico Mexico
Panama Panama
Paraguay Paraguay
United States United States
Uruguay Uruguay
Categorias / Industrias
Publication: 0000-00-00 00:00:00
United States SAM

C222--502-22-1-5041-0006 High Voltage Electrical Engineer

Process Number 36C25622Q0209

USA

Dates:


Notice ID:

36C25622Q0209

Department/Ind. Agency:

VETERANS AFFAIRS, DEPARTMENT OF

Sub-tier:

VETERANS AFFAIRS, DEPARTMENT OF

Sub Command:

256-NETWORK CONTRACT OFFICE 16 (36C256)

Office:

256-NETWORK CONTRACT OFFICE 16 (36C256)

General Information:


All Dates/Times are:

(utc-06:00) central standard time, chicago, usa

Updated Published Date:

dec 10, 2021 11:51 am cst

Original Published Date:

0000-00-00 00:00:00

Original Response Date:

dec 17, 2021 10:00 am cst

Inactive Policy:

manual

Updated Inactive Date:

jan 16, 2022

Original Inactive Date:

dec 22, 2021

Initiative:
  • None***--***

Classification:


Product Service Code:

c222 - architect and engineering- general: electrical systems

NAICS Code:

541330 - engineering services

Description:


Original Set Aside:

Questions and answers: Is the total effort 600 hours full time and 10 hours overtime? The majority of the work will be performed during normal working hours. Emergency operations or troubleshooting would require limited O/T being used as approved by the site contracting officer representative. 10 hours overtime is estimated for bidding purposes. Is the engineer required to have a PE valid in LA?    Just a PE. It can be from another state. Is there a requirement for a surety clearance? If so what level? No security clearance will be required. No VA sensitive information will be accessible to the engineer. Vetting will be performed by the VA police service for contractor badging. What is the past performance requirement? Past performance of the proposed Engineer will be required to have performed 5 years of high voltage Construction design or field level management of high voltage work. Who is the incumbent contractor and what is their contract number? This is a new requirement. Will you defer the due date until 7 days after receipt of answers? The deadline for submissions remains unchanged.

Attachments / Links:


Document Size Updated date Download

Contact Information:


715 SOUTH PEAR ORCHARD RD., PLAZA 1

RIDGELAND , MS 39157

USA

Primary Point of Contacts:

Andrew T Misfeldt