Sunshine/Ouray Toilet Replacement
Process Number 1240LT22R0018
Dates:
1240LT22R0018
Department/Ind. Agency:AGRICULTURE, DEPARTMENT OF
Sub-tier:AGRICULTURE, DEPARTMENT OF
Sub Command:Grand Mesa, Uncompahgre & Gunnison National Forest
Office:Grand Mesa, Uncompahgre & Gunnison National Forest
General Information:
(utc-07:00) mountain standard time, denver, usa
Updated Published Date:dec 20, 2021 07:34 am mst
Original Published Date:0000-00-00 00:00:00
Updated Response Date:jan 26, 2022 01:00 pm mst
Original Response Date:feb 04, 2022 01:00 pm mst
Inactive Policy:15 days after response date
Updated Inactive Date:mar 06, 2022
Original Inactive Date:feb 19, 2022
Initiative:- None***--***
Classification:
total small business set-aside (far 19.5)
Product Service Code:5450 - miscellaneous prefabricated structures
NAICS Code:327390 - other concrete product manufacturing
Description:
SUNSHINE/OURAY TOILET REPLACEMENT A Pre-bid conference call will be held at a future date to address questions, this will be in lieu of a site visit due to inclement weather. The scope of work includes but is not limited to: This work consists of the fabrication, delivery, off-loading, and installation of 4 double unit precast concrete toilet buildings with vaults, as well as demolition and disposal of 4 existing toilet buildings. The OPTIONAL bid item may or may not be awarded, but this consists of the fabrication, delivery, off-loading, and installation of 1 double unit precast concrete toilet building with vaults, as well as demolition and disposal of 1 existing toilet building. Toilet buildings must be fully accessible and must meet the design standard for naturally ventilated, odor free buildings.This work consists of the fabrication, delivery, off-loading, and installation of 4 double unit precast concrete toilet buildings with vaults, as well as demolition and disposal of 4 existing toilet buildings. The OPTIONAL bid item may or may not be awarded, but this consists of the fabrication, delivery, off-loading, and installation of 1 double unit precast concrete toilet building with vaults, as well as demolition and disposal of 1 existing toilet building. Toilet buildings must be fully accessible and must meet the design standard for naturally ventilated, odor free buildings.
Attachments / Links:
Document | Size | Updated date | Download |
---|
Contact Information:
GRAND MESA, UNCOMPAHGRE GUNNISON 2250 HIGHWAY 50
DELTA , CO 81416
USA
Primary Point of Contacts:Denise Steel
Secondary Point of Contact:Lonnie Root