Pais / Región
Paises

Provincias / Departamentos
Colombia Colombia
Argentina Argentina
Canada Canada
Chile Chile
Ecuador Ecuador
España España
Guatemala Guatemala
Honduras Honduras
Mexico Mexico
Panama Panama
Paraguay Paraguay
United States United States
Uruguay Uruguay
Categorias / Industrias
Publication: 0000-00-00 00:00:00
United States SAM

Willow Creek Toilet Replacement Arapaho and Roosevelt National Forests and Pawnee National Grassland

Process Number 1240LT22Q0012

USA

Dates:


Notice ID:

1240LT22Q0012

Department/Ind. Agency:

AGRICULTURE, DEPARTMENT OF

Sub-tier:

AGRICULTURE, DEPARTMENT OF

Sub Command:

White River National Forest

Office:

White River National Forest

General Information:


All Dates/Times are:

(utc-07:00) mountain standard time, denver, usa

Updated Published Date:

(utc-07:00) mountain standard time, denver, usa

Original Published Date:

0000-00-00 00:00:00

Original Response Date:

dec 02, 2021 05:00 pm mst

Inactive Policy:

15 days after date offers due

Original Inactive Date:

dec 17, 2021

Initiative:
  • None***--***

Classification:


Product Service Code:

y1fb - construction of recreational buildings

NAICS Code:

236220 - commercial and institutional building construction

Description:


Original Set Aside:

Willow Creek Campground Toilet Replacement Sulphur Ranger District Arapaho and Roosevelt National Forests and Pawnee National Grassland Grand County, Colorado Solicitation Schedule; Solicitation Close Date: 12/02/2021 1700 MST Questions: All questions pertaining to this solicitation MUST be marked: 1282D718Q0012 and submitted in writing and addressed to both the Contracting Officer Repetitive Kamber Box by email at no later than: 11/19/2021 5:00pm MST - No phone calls will be accepted. Quotes: Quotes from this solicitation MUST be marked 1240LT22Q0012 and be submitted in writing to Lonnie D. Root, Contracting Officer via Email to lonnie.root@usda.gov Project Description: The Contractor shall furnish all management, labor, equipment, supervision, tools, materials, transportation, operating supplies, supervision, workman’s compensation, unemployment insurance and incidentals necessary to perform the work in accordance with the specification and provisions of the contract. Rock may be encountered during excavation. Any excess material shall be incorporated and blended into the site. Seed and straw all disturbed areas. Base: This base project consists of the removal and replacement of two (2) existing toilet that were damaged in 2020 fires. The new stick-built toilets shall be double toilets with a concrete vault and constructed superstructure. The replacement toilet will be in the same location as the existing toilets. Option: Line item 5 includes construction of ADA pathways to (3) three toilet structures (two new and one existing) on site. This will include preparation, placing bedding, and leveling. Project Location: From the Sulfur Ranger District Information Office head east on 10-mile Dr. toward US-40 W. Turn left at the 1st cross street onto US-40w and travel for 2.0 miles. Turn right onto US-34 E and travel for 5.2 miles. Turn left onto CO Rd 40 and travel for 3.7 miles to reach Willow Creek Campground at CO Rd 40, Granby, CO 80446. Alternative route through private may be authorized for use if needed by the District Ranger if permit from landowner is completed. From the Sulfur Ranger District information office head east on 10-mile Dr. toward US-40 W. Turn left at the 1st cross street onto US-40w and travel for 2.0 miles. Turn right onto US-34 E and travel for 5.2 miles. If the above alternative access rout is required for construction, it shall be through a private road with FS access agreement. Access scheduling and timing for use shall be coordinated between the Contractor, Sub-Contractors, Suppliers, Forest Service and Landowner. Preferred access timing is on Thursdays between 1000am and 1200pm. There is low hanging sign with a rope to pull it up out of the way if needed. Willow Creek Campground coordinates: 40.142545129077426, -105.95307059587206 Schedule: Installation work must be performed during the period of May 31,2022 – May 30, 2023. The Contractor shall provide a work plan and schedule that demonstrates how the work will be completed and in what time frame at the pre work meeting. Contract Officers Technical Representative (COR): Kamber Box Civil Engineer • FS-R6-Colville NF-SO Phone: 509-675-5405 Email: kamber.box@usda.gov All Offerors shall be registered in the System for Award Management (www.sam.gov) database to be eligible for award. The Forest Service reserves the right to cancel this Request for Proposals at any time, as wMatyell as to award any or all to either one or a combination of more than one vendor whichever deems most advantageous to the Government.

Attachments / Links:


Document Size Updated date Download

Contact Information:


WHITE RIVER NATIONAL FOREST 900 GRAND AVENUE

GLENWOOD SPRINGS , CO 81601

USA

Primary Point of Contacts:

Lonnie D Root, Contracting Officer

Secondary Point of Contact:

Kamber Box